Use this guide to set up your Controllerbox CNC control system.

Configuration

After you have turned on your controllerbox PC by pressing the power button you must then check the configuration to make sure you can use your machine properly. All programs will already be installed on your controllerbox so the only thing that can be changed at this point is the configuration settings. The settings must be configured specifically to your machine and operation processes. The configuration settings to check before using machine are as follows:

  • Place the Controllerbox on the stand securely. Plug in the wiring harness connection and plasma cutter connection. Plug in the Controllerbox power cord and plasma cutter power cord.
  • Ensure plasma cutter torch is connected properly with correct consumables. Connect ground cable properly to work area. Make sure plasma cutter powers on with correct cut settings and have operator manual at hand for adjustments.
  • Ensure Controllerbox computer powers on.